Ramprastha Primera Sector 37D, Gurugram

Property ID : Ramprastha primera, Ramprastha primera sector 37d, ramprashta city appartment

Luxury Apartments, Ready to Move, Resale Unit ₹2 Cr.* - 3 BHK, 3.5 BHK
1775 Sq.Ft. 3 Bedrooms 3 Bathrooms 0 Possession
 
 Add to Favorites
Print

Ramprastha Primera overview

Project NamePrimera
Land Area3.15 Acres
No. of Towers4 Towers
Total Units352 Units
Total Floor22 Floors
Rera No.21 of 2018
Size range1775 – 1800 sq.ft.
LocationSector 37D

Premium, air-conditioned three-bedroom flats are available at a New High Primera in Ramprastha City near the Dwarka Expressway. Primera is proud of its exceptional building quality, simple architecture, and numerous ultra-modern features. It continues Ramprastha’s tradition of offering opulent, high-caliber residences at reasonable prices.

It is situated on a 24-meter-wide road with lay-by lanes that make it easy to access the apartment towers. Its straightforward, linear design makes it both contemporary and enduring. Primera is on line with international living standards thanks to its wide roadways, three levels of security, continuous electricity supply, and earthquake-resistant buildings.

Primera is a self-sufficient complex with a clubhouse and a pool that provides a wide range of amenities for a modern lifestyle.

Highlights of Ramprastha Primera

Ramprastha Primera

Highlights

  • ▶  5 ACs per apartment.
  •  
  • ▶  300 meters from Dwarka Expressway.
  •  
  • ▶  ~15 minutes from IGI Airport (via Dwarka Expressway).
  •  
  • ▶  Excellent upcoming Metro connectivity.
  •  
  • ▶  In close proximity of reputed schools, hospitals, malls etc.
  •  
  • ▶  Outdoor activities like Half Basketball Court, Skating Rink, Kids Play Area, Theme Park etc..

Primera Location Advantages

▶ A township spread over 450 acres
▶ 0 km from Dwarka Expressway & Metro
▶ 15 min. drive from IGI Airport

▶ ULTRA MODERN AMENITIES like School, Hospital, Hotel, Shopping Mall, Multiplex, CLUB

Specifications of Primera

Floors
Master Bedroom:Laminated Wood Flooring
Living/Dining/Lobby & Other Bedrooms:Vitrified Tiles
Balconies/Terraces:Anti-Skid Tiles
Kitchen & Toilets:Anti-Skid Tiles
Walls
Bedrooms
/Living
/Dining
/Lobby
:Acrylic Emulsion
Balconies
/Terraces
:Acrylic Emulsion/Weather Proof Paint
Kitchen
/Toilets
:Combination of Ceramic Tiles
Ceilings
Ceiling:Acrylic Emulsion
Counters
Kitchen:Counters in marble/Granite
Fittings/ Fixtures
Kitchen & Toilets:Single lever CP fittings, White chinaware, Shower partition only in Master Bath, Stainless steel sink with drain board
Wood Work
Master Bedroom:Wooden cupboards*
Kitchen:Modular Kitchen*
Doors & Windows
Internal Doors:Hardwood door frames veneered & polished/Skin moulded shutters/Flush door shutter
External Glazings:UPVC Doors & Glazing
Electrical
Split air conditioners in all bedrooms, Drawing & Dining, Modular type switches & sockets, Copper wiring (fittings like fans, lights fixtures, geysers, appliances etc. are not provided)
Security System
Proximity Card Access Control, CCTV for basement parking and Entrance lobby at Ground floor, Boom barriers at Entry & Exit of the complex
Facilities
High speed elevators, Power backup and treated water supply, Adequate basement parking, Landscaped courts with sit out spaces, Kids play area, Pedestrian paths, Jogging trail with several trellises enhancing outdoor landscape, Shopping Arcade
Infinity Club
Infinity pool, Gymnasium, Basketball court, Skating rink (In the PRIMERA Club)

*on extra payment

 

Project Plans

Gallery

Booking & Documentation

For Booking in the above-mentioned property please Call : 9211901000 | 8527100377 or Visit - Unit no. 263A, 2nd Floor, JMD Empire, Sector 62, Sohna Road. Gurgaon

Similar Properties